@MastersThesis{Santos:2014:PrMoIn,
author = "Santos, Bruno Vicente dos",
title = "Proposta de modelo institucional com contratante principal para
desenvolvimento e gest{\~a}o de projetos espaciais no Brasil",
school = "Instituto Nacional de Pesquisas Espaciais (INPE)",
year = "2014",
address = "S{\~a}o Jos{\'e} dos Campos",
month = "2014-11-14",
keywords = "proposta, gest{\~a}o de projetos, {\'a}rea espacial,
organiza{\c{c}}{\~o}es p{\'u}blicas, contratante principal,
proposal, project management, space area, public organizations,
prime contractor.",
abstract = "Este trabalho traz uma proposta de modelo de gest{\~a}o de
projetos na {\'a}rea espacial conduzidos por
organiza{\c{c}}{\~o}es p{\'u}blicas brasileiras, propondo a
inclus{\~a}o da figura de um Contratante Principal na cadeia
cliente-fornecedor. O trabalho busca, tamb{\'e}m, descrever a
intera{\c{c}}{\~a}o dos pap{\'e}is e fun{\c{c}}{\~o}es entre
Patrocinador, Contratante Principal e os Subcontratados, a partir
de conceitos de gerenciamento de projetos e engenharia de
sistemas, buscando trazer maior flexibilidade e agilidade {\`a}
cadeia produtiva de sat{\'e}lites desenvolvidos no Brasil. O
estudo parte de um diagn{\'o}stico dos maiores problemas que
afetam o setor, apresentando sugest{\~o}es para amenizar os
efeitos de problemas como a car{\^e}ncia de recursos humanos, a
insufici{\^e}ncia de investimentos, e os obst{\'a}culos de
natureza legal que se manifestam de forma cr{\^o}nica nas
organiza{\c{c}}{\~o}es p{\'u}blicas nacionais. ABSTRACT: This
study presents a proposal for a project management model in the
space field led by Brazilian public organizations, suggesting the
inclusion of a Main Contractor in the customer-supplier chain. It
also seeks to describe the roles and functions interactions among
the sponsor, the contractor and subcontractors, from concepts of
project management and systems engineering, seeking to bring the
flexibility and agility necessary and desirable to the productive
chain of satellites developed in Brazil. The study starts with a
diagnosis of major issues affecting the industry, offering
suggestions to mitigate the effects of problems like the human
resources shortage, insufficient investments, and the obstacles of
legal nature, which manifest themselves in the form of chronic
national public organizations.",
committee = "Loureiro, Geilson (presidente) and Souza, Petr{\^o}nio Noronha de
(orientador) and Bogossian, Ot{\'a}vio Luiz and Ghizoni,
C{\'e}sar Celeste",
copyholder = "SID/SCD",
englishtitle = "A proposal of an institutional model with a main contractor to
develop and manage space projects in Brasil",
language = "pt",
pages = "123",
ibi = "8JMKD3MGP5W34M/3H88A5B",
url = "http://urlib.net/ibi/8JMKD3MGP5W34M/3H88A5B",
urlaccessdate = "27 abr. 2024"
}